Front porch and steps,
May 29, 2006
Front porch and steps,
June 18, 2006
(Yes, that's really the color!)I decided to attack the walking surfaces of the steps today. My logic was that, since there is no mail delivery today, I would get the maximum amount of downtime from the steps after I painted them, allowing the first coat to dry thoroughly.
Hah. My neighbor told me after I strung up the "WET PAINT" sign that the mail comes at 8:30 in the morning. I'll be getting my mail before I head for work. How weird is that?
I had myself on a tight schedule today. 8:00 - 8:45: Church; 9:00 - 9:30: Grocery shopping; 9:45 - 10:00: breakfast; 10:00 - 11:00: Scrape, sand, sweep, and mop steps; 11:00 - 12:00: prime steps; 12:00 - 1:00 purchase Floor & Porch paint from Home Depot while allowing primer to dry; 1:00 - 1:30: Apply first coat of regular exterior paint to left-side vertical boards around porch; 1:30 - 2:00: apply first coat of Floor & Porch paint to steps....
Of course that wasn't how it worked out. It was so hot I had to take a 20 minute water break every hour. Scraping the steps took a very long time, although my cousin's electric sander helped a lot. Add in sweeping, mopping, priming, laying down a first coat of paint on the left-side boards, and taking a few long-distance phone calls, and I didn't head out to the Home Depot until nearly 5:00. Didn't start putting on the first coat of Floor & Porch until after 6:00. Fortunately it takes only 4 hours to dry, but 24 hours to be ready for the second coat, so I didn't feel too bad about only getting one coat on. I might not even be able to get a second coat on tomorrow - it will technically be too soon to start when I get there.
I'm gearing up for Tuesday. I hope the porch repairs are as straightforward as I'm being told.